Gang Green 68 GTS

I had warm temps here Monday and Tuesday so I rolled the Dart outside so I could sand on it. Makes way too much mess in the Shop to do it there. Working on filling the rust pits after blasting and rust-preventative. I thought I could get it all done in and in primer in those two days, but I failed. More hand sanding than I thought to get all the inner/seen panels smooth after applying the rust preventer with a brush. I have new respect for body men now. Also got most of the suspension and disc brake parts rebuilt and painted. Installed all of the control arm bushings and ball joints. Still need to get the K frame and the strut rods and stabilizer bar out side to blast. I'm hoping next week it will warm up a little so I can roll the car out and get it in primer from the doors forward. Then to cut a few pieces of metal out and replace.

is that the same stogie from a couple weeks ago?