My New Shop!! Yiippeee!

I believe I need to pour my garage floor level as possible. Look here:

http://www.garagejournal.com/forum/showthread.php?t=86023

I was going to have a slope back to front so the water will run out when washing the garage. I have a nice 4' squeegee that I can use to push the water out. After seeing the problems with unlevel floor with a lift I think I should level it.

What do you guys think or would do??


I poured my floor level for the first 10' where my work bench is then sloped it 1" from there to the door. That's going to be a nice shop.