Foundation

Pistons, and rods are now installed. Took a bit......... and we covered it up toot sweet......



We have moved on to the rocker/valve system and checked all the tolerances we could think of,........... and maybe a few of our own.





We made our own pushrod tool so we can find optimum lengths....