Foundation
Pistons, and rods are now installed. Took a bit......... and we covered it up toot sweet......
We have moved on to the rocker/valve system and checked all the tolerances we could think of,........... and maybe a few of our own.
We made our own pushrod tool so we can find optimum lengths....
Print