Well I have been working on the wiring and I am hoping to have it all done by this weekend.
I am working the final list of things that I need to get done so it can finally go off to the Dyno.
Need to find the time to finish the following.
1) Finish Wiring
2) Drill Down Pipes weld in bungs for Dual 02 sensors
3) Drill Intake Water Log & weld in bung for Mechanical Temp Sending Unit.
4) Finish Weld Turbo Brackets
5) Install Meth Nozzles
6) Install Push Rods & Set Valve Lash
7) Finish - Install Intake Manifold
8) Install Oil Filter & all Hardware
9) Make and install Spark Plug Wires
10) Prime Engine and make sure Turbo Drains work well. Will prime them with a few quarts of oil into a bucket before I attach them to the Pan.
10) Wrap Headers, turbo pipes and Down Pipes with Heat Wrap.
Still need to buy a few more items.
1) 02 sensors that wire into the MS3 and gauge
2) Meth Injection kit
3) Spark Plug Wires
4) Heat Wrap for plug wires.