My New Shop!! Yiippeee!

Looks awesome Marland! Is this next inspection the final?

The inspection I was trying to get today was "rough in". Next will be final.

Well I didn't pass inspection :wack:

The first thing there was a "bonding screw" in the sub panel that is not suppose to be installed. I didn't even know of such a thing but it is removed now.

Second was the "designated circuits should have only one wire and be marked". I should have marked the the circuits such as "refrigerator" "microwave"!
This I can't believe..... I have "ref" and "micro" wrote on a stud next to the outlets with one wire going into the outlet! One circuit breaker on each!

Third "all other outlets needs to be ground fault outlets". No kidding!! I have not got that far yet!!

Fourth and last " all ground wires need to be bonded at time of rough in inspection" I didn't know this or I would went around and made up all the switch and outlet boxes. I thought this fell in the final inspection!! Oh well.

I gave him a call today and asked him a few questions about the above turn downs. He said I could go ahead now and insulate, sheet rock, etc... Head towards the final and that he will check off the above turn downs when he comes back to do the final. This total BS!!! He HAD to turn me down on something. He wasn't going to go back to the office empty handed!!

Anyways I did amazingly well on it if that is all he could get me on. It doesn't look like it via the pictures but there is a lot of nick pic work that has been done in order to pass inspection.