Tubbing the Valiant

The exhaust is finaly done. TTi's to Spin Techs all 3". I can't wait to spark it up. Drive shaft safety loop is installed. It's back at Progas Engineering to finish off the roll bar and then home for the push to git er done.

:coffee2: