Order of installation

Gerahead,

Thank-you. It was one of those bizarre questions that pops into you head when you are trying to visualize what your next step will be. The car is on it's side at the moment. Two coats of chassis black, re installation of the gas tank and a set of chassis connectors and we will flip it back. I have a set of dollies that we push it around on. I was going to run the brake/gas lines them. Since I am not running them with the OEM style attachments, i think I have some flexibility.

It is warming up and the kid's sports are soon winding up for the year.

I will post pictures soon.

Ian.

PS -nice resto. Because the cost of paint is so freaking high, we are painting the bottom black bit doing the engine by in the same colour as the car. Our car will be a runner, not a show car. Our resto before I hurt myself last fall. http://www.forabodiesonly.com/mopar/showthread.php?t=147435