70 duster street strip build

I will be installing a full floor panel. And i will add frame conectors at the same time using 2x2 steel square tubing.The tubing will slide into the rear frame rail and attach to the torsion bar cross member.Later the rollbar hoop will atach to the floor and the frame conectors
View attachment 104.jpg

View attachment 105.jpg

View attachment 106.jpg

View attachment 107.jpg

View attachment 108.jpg

View attachment 103.jpg