Electricians on FABO - I want to add a 60Amp sub panel

Let me stir it up some; you need the main breaker in the sub. Dunno about other states, but Fl loves 2 10' copper grounds. The electric co will ohm those grounds, before giving you a meter. My shop is overhead power, I applied for elect as a barn(free service here). Had my electrician install panel,and mast, with just the main breaker, $200. I installed 1 breaker and receptacle- good to go.

Buddy has underground, he met the power guy, figured out what pole to come down on; 30" he laid the conduit. Installed the main panel with main, 1 breaker with rect, drove down the ground. Only problem was, ground ohms off, so the power guy got some det cable, wrapped it around the ground connection and lit it, to weld. tested good, now buy 38 8' lights, lol.