Are talking die back? If so, if its cured die back shouldn't happen. Ive been using these products for 3 decades and have been a certified PPG refinish tech since 1992. Ever since they took the lead out of epoxy primer the dry times slowed down drasticly. I wouldn't top coat epoxy for at least 2-3 hours after the second coat has been applied. Better yet over night but I know its kinda hard if your working in a production shop.