65 Barracuda Gasser + 1956 325 Dodge Hemi Build

Tonight we moved the engine from the engine stand to the chainfall so we could get at the back of the engine. Installed the last block plug over the camshaft end and began fitting up the trans adapter, crank hub adapter, flex plate and starter. All these little/necessary things take up some hours.
We found that since I had the crank flange tapped (1/2") at the machine shop that none of the flex plate bolts work.....so off to the hardware store tomorrow morning to get the right bolts. And it also meant we had to ream all the bolt holes out to 1/2". But now everything matches/fits. I have some pictures of the nights work.
I also took a close up of the push in breather on the valve cover showing the grommet attachment.
We are close to swinging it into the engine bay!!!! woooohoooo!