Atlas 4 Post Lift.....life is good.

Got the cross brace at the top installed, got the hydraulic line run..got the cable pulled to the cylinders...got the upper limit bar installed.

need to drill 12 holes in the concrete in the morning....should have it up and running tomorrow afternoon...