First engine build.

I finally had some progress been busy with other projects: rebuilt an atv and working on my dads 49 chevy fleetline. I got the crank installed and it went pretty well, first one I did by myself. I cleaned up everything with acetone and cleaned passages with a cleaning brush, I was amazed how much came out of the crank passages. The bearings clearance was between .002-.0015". The end play was -006". The crank was ground .010" main and rod. The casting date is 2-13-70.