Rapom's Rocket - just another Duster build thread

The lower link bars are bolted to boxes welded into openings cut in the frame exactly like any spring into frame relocation. The first step is to clean the frame of undercoating and 40 years of road spooge. Next is to lay out cut lines. Cuts were made with a 4.5” grinder with metal cutting disks. Because of the narrowed axle’s width I did this install a little different than I'’ve done in the past and kept the outside skin of the frame intact.

View attachment IMG_0884.jpg