New concrete

Started adding 8 feet to the front of the shop last summer to make it 48 feet door to back wall, have a 18x30 clean room attached behind that and still fill it up, never big enough. Poured 8x 18 slab today to get ready to move Big door out before winter hits. Insulate and Sheetrock still to do, getting to old to trowel slabs, going to be sore tomorrow!