Thing I hate most about my/all A-bodies

The lame engineering in the electrical system! 10 ga wires that charge through the amp gauge yet are connected at the firewall bulkhead with spade connectors? How about a blower and AC system with switches that were designed for a load of about 10 AMPs less than what the thing actually draws so you can get a slow burn on everything! :)