Mini tubs????

I agree with CRACKEDBACK. If you don't do both the spring relocation and the mini-tub you haven't gained anything much really.

I just did both on my 71 Dart this winter.
It was the first time I ever did it. Saying that it took me a long time to do each project and I did them both seperately rather than trying to do them at the same time that some may be able to do.
It took me approx. 4 days each to complete them, and I feel like I did an excellent job.
I did plan it out and get my parts first then completed it during the winter so I had lots of time.
I did the spring movement first and the mini-tub second.
It wasn't that difficult, but I had a couple friends to talk to whenever I had questions.
If you are a decient welder or have someone who can that makes it easier too.

My biggest tip would be don't rush it, and if you start to get frustrated step back and think of a solution rather than push forward and worry about it later. Oh ya mesure 2 or 3 times before you start cutting.

Good luck.