Pro Touring 10K

transmission tunnel is just about finished up. cut the hole for the shifter and got the new lever mocked up. sitting in the seat its in a very comfortable position. I just need to mark and drill the holes to mount the lever .Wanted an industrial look for the pedals so I used Lokars Lakester series. It also freed up some room from the stock pads. pretty happy with everything so far. the turbo manifold is off and out to jet hot for there 2000 series powder. can't wait to get it back. just a little more to do before I start tearing it down to finish up the body work and get it in some paint.

20160504_195244_resized.jpg

20160504_195158_resized.jpg

20160504_195142_resized.jpg

20160504_190302_resized.jpg

20160504_190247_resized.jpg