any paving experts on here?

X2 With topslcuda , I would dig down so that
Paver surface is equal to lawn surface when finished. Pack dirt, 3/4 minus pack then an
Inch of sand , screed level. Use straight 2x4's and 4' level. Once level lay pavers in pattern you want walking on pavers as you
Go , not the sand. Use a rubber mallet to tap
Pavers tight. When finished spred sand over
Pavers and work in with compactor. Pavers should sink about a 1/2" keep moving as not
To pack in one place for too long. When finished sand should be packed into cracks
Sweep of excess . Fired pavers are rated at
About 6000 lb per sq in vurses concrete at
3000 lb. I've layed a few. Good thing about
Pavers is if they start to sink you can pull one or all and reset them