Project Munin/68 Dart

Here I am after weld in, things went good. I built in a flange all around the edge of the panel and it's welded to both the old floor and the frame rail sections where the old floor was spot welded. I went ahead and started the weld nuts for the gas tank and coated the bottom side of the floor with rust inhibitor and then a coat of undercoating. I will be using six 1/2" weld nuts, three per side to secure the tank.

View attachment 1715029736

View attachment 1715029737

View attachment 1715029738

Nice to see this thing almost done. Looks great. Who made the gas tank and is it baffled?