CONSTRUCTION LOAN EXPERIENCE???

Thanks for all the responses so far. We are early in the process, currently our design is the conceptual phase and should be done in a week or so. Then modifications if desired and on to the structural design. At the same time a septic design is in the works and the builder is going to physically walk the property. We are hoping we don't have to survey, don't think either the septic or structures will be too close property lines. I will ask about the funds disbursement, seems like an important aspect. Fortunately this company has been going strong for awhile on Whidbey Island.