New 408 for the Flyfish

Here is the other head, stripped down and ready to get cleaned along with the valves. After cleaning it was valves lapped, new spring cups, valve seals, retainers, locks, set spring height, add outer springs only and install....a couple hours later and the motor is about ready to install.

Both heads are on now (sorry, no pics at the moment), I just need to put in pushrods and valve train so I can flip the motor (so the lifters don't fall out) and install the pan. I'll do that this week, that way I SHOULD be able to drop this thing in the Cuda Saturday....barely meeting my goal of having this thing in the car by June, lol.

IMG_2488[1].JPG