James's 1970 Dodge Dart build.

Thank you. I got the hold downs through summit racing. They also make them for most sizes (3/16, 1/4, 5/16, 3/8, 1/2, 5/8, & 3/4)

double line clamp, 1/2" line:

Helix Line Clamps HEXLC2500

single line clamp, 1/2" line:

Helix Line Clamps HEXLC3500

I got the 1/2" through-frame fuel fitting from AMP Cherry Performance. They are Stainless steel. Be advised, you need to call them on the phone, and have them machine/ back cut the nut to .200" , -two hundred thousandths- in order to give us more threads because our frame is thicker than average.

THRU THE FRAME RAIL FUEL FITTING


Thank you very much! Also, that is what I could not figure out about the pass though fittings. The one I could find, all looked to small to go through the frame. Again, thank you and you do great work.