Drivetrain/K frame installation and removal dolley

Working on this off and on. Had some pieces i got from work with wheels on em that were going to scrap which saved me some fabrication time. 2.5" square tube with 1/8" wall thickness. Designing this to pin together with bolts and be dissassembled for storage when not in use. Still need to get around to finishing up the rest of it. Cant figure out how i want the K to set up on there. The red iron is 2" thin wall to help mock it up. I now have 2" 1/8" thick wall tube to make this part of the dolley. I am going to pick up and install a scissor jack on this part to slide fore and aft for component assembly, dissassembly on the dolley. I guess the true test of this will be the out of the bottom removal of the temp installed mocked up drivetrain in my 67 notchback. Will post more pix as i get farther along.

20181006_152226.jpg

20181006_165737.jpg

20181006_165748.jpg