Condensation issue

Doesn’t seem reasonable that enough water could migrate through 4-6 inches of concrete to form puddles of water in a short period of time. The permeability of mature concrete is about .1 billionths of a centimeter per second. I’m not an expert on this by any means but I think it means that it would take 10 billion seconds for some amount of water to travel one centimeter in concrete.