Hi all, doing a remodel in basement. Extending the shower drain and adding a back flow preventer. Extended approx 3 feet. Now with the slope it puts the p trap connection to straight pipe approx 1/2" above the existing concrete. I was going to "backfill" with gravel that I removed, then top with concrete and then floor leveler, finally topped with a layer of dricore.(7/8" thick)Then shower base. Bathroom is small approx 50-60 sq ft.
I'm kinda wondering how to go about this?? In the 3rd pic the small level is where the p trap connects, and it sits approx 1/2" above concrete at the edge.
Where the larger 4' level runs side to side, that is where the leading edge of shower base will be. ABS sits flush with concrete right there.
Sika floor leveller and then dricore for subflooring throughout.
Looking for some guidance here.
Thanks
Steve
View attachment 1715294582
View attachment 1715294581
View attachment 1715294583