Yes, we had an inspection done, but if it was noticed, I dont recall hearing about it
I called my power company and the could tell me a new meter was installed "at some point"
They couldn't tell me when or where
On monday I'll call the city, see if I can find a history on permits, maybe that will shed some light on it
Then I'll see if I have them make the 200 amp panel the main, so I can install a proper interlock (and move that cable to avoid pinch points)