They were cups and turned in fully then the preload varied 1 maybe 2 turns at most. The machine shop ordered the valves so idk what length they are and he picked the springs also. Said the 1s i had were too much but the explanation I think is about like a titer totter and then look for balance between valve and shaft. Is that right?