Check in on your local machine shops guys

Mine is now up to an 8 week wait on machine work, and they're not building any engines at all until next winter. I'm actually about to try a new (to me) place in MA, they do a lot of circle track work, and with the tracks closed they told me two weeks to bake/shot block, deck, align bore, bore and hone. It's a little more than my regular place, but I'll pay the extra $70 to save six weeks.