It is a 1in control joint. Cut when the concrete was still wet.
So if it is placed in the orientation shown with the lift columns being placed 6” from where the edge of the new slab is poured. Would this be a problem? Since the interface where the new concrete meets the old is 6” from the lift columns? If a crack forms