Blizzard

Imagine if you were waiting to pour the footings and foundation? That would be a lot of waiting to get weather warm enough to pour.

Actually I can pour in most temperatures.
The first pour was 12* and the second pour was 27*.
Since my foundations and walls are enclosed with 2 5/8" foam they are insulated. I just blanket the tops for the night and I get a strong enough concrete cure.

20201110_154027.jpg

20201113_170419.jpg

20201219_090946 (1).jpg

20201222_142144_HDR.jpg