Prefab steel buildings

I had to pay a $75 county fee/inspection to show that my building with no plumbing would work with my existing septic tank.

You might also want to check the setback.

In my area concrete can go right up to the property line, but any structure (other than a fence) must be 5 feet away.


That's likely because it's easier bust up concrete than take a building down.