Howdy all. 2 out of 4 generators down, 1 of the mains (2450KW) and 1 of the ships service (994KW). We are also late on the oil change on the other main. So waiting till wind is too high for crane ops to switch to 1 ships service so I can change oil in the main.
In order to run the 500 ton crane you need 2 ships service or 1 main. So between people touching and breaking stuff specifically labeled do not touch, yeh.....:mad: