Stop in for a drink.

Another 8’ added to the rock wall. The entire wall including both sides is now 70’ long and growing. Over 3000 lbs of granite stones clawed from the ground and hand laid into the wall as we have dug holes for trees and plantings. Only 20’ left to go. Since we have about 10 more plantings eft to dig for, it should be completed easily.

Cheers!

DC244E99-635F-4A4B-8BE6-B774F4187302.jpeg