My new 75 Duster stocker, let the fun begin.

Well after a lengthy delay, the SS/JA Duster should be ready for end of June. Just installed new Aerospace rear disc brakes last night. Will be using two step ignition, the brakes combined with the two step will allow me to hold full throttle on the line without rolling through the beams. The Pro Trans 904 is refreshed and ready to go. Engine should be done later this month, then install the Accusump accumulator. I will keep posted on progress.

20210601_175653.jpg

20210603_070545.jpg