Doug's '68 Dart

Wow took me 4 months waiting to get mine then I cancelled with summit and ordered directly from AMD and that was faster and that was in December. If there small still would cut them out then patch cutting out the entire floor pan for small holes may not be worth it. Also don’t forget if u need or want to order the wire covers on side of doors I forgot to order now I’m waiting. B82890A6-7A41-4A51-BD81-C4F13B76E384.jpeg89501FF8-1134-4365-B672-77477D9584CE.jpeg 77085136-1833-48F2-BAAA-C8470257D8E8.jpeg

116AD8C5-3565-457F-81E0-35396476A36A.jpeg