Planning a shop build, any suggestions?

I poured slab and put anchor bolts in the used coupler and all thread to extend it. I blocked it up 3 blocks high and poured them full of concrete then treated 2x8 plate was bolted down so it is actually connected to slab. Also slighted slope towards doors. It can be washed out without getting wood wet.

DSC00018.JPG