Planning a shop build, any suggestions?

We're getting close to replacing our drive and once the substrate is completed, we will be saturating the rock with Vapor Lock 555 to stabilize that before the mud.

I see and understand the vapor lock 555 for the base. Are you spraying the 555 on top of the base or are you mixing it as the spec sheets call for?

What are the other products you are using in the actual concrete?

I know which batch plant is best in my county. Both batch plants will tell me not to use whatever product as they are not responsible for what happens. Typical batch plants. Again, costs money and will crack. That's the only guarantee from plants.

Every few years I have to get a new crete guy as people come and go. I have to be able to not only talk the batch plant into adding the products but I have to talk my crete guy into pouring a product that he will not want to warranty. Regardless of spec sheets, still difficult to talk a crete guy into warranty on an unknown product.

Can I tell my plant that the product cleans up inside of the cylinder? That is going to be their reservation. Will it stick to the barrel? Will it clean after a trip back to the plant?