Planning a shop build, any suggestions?

.......................................................................................................................

Can I tell my plant that the product cleans up inside of the cylinder? That is going to be their reservation. Will it stick to the barrel? Will it clean after a trip back to the plant?
When I worked construction we did a huge pour for a slab. The driver said we must take all as he was not driving back to the plant with product. We throw together 4 box forms and made Ecology blocks.


All along I-80 in Nebraska are cement mixer barrels with Averts painted on them. Must be 50 barrels. Thats a lot of screw ups of a trip too far from the batch plant and it sat up in the barrels on the trip back.
Paulsen-Concrete-Advertising-I-80-NE-2018-06-08.jpg