Checking springs should be here tonight, but I haven’t ordered pushrods yet. Once there are here, can I mock up without gaskets at measure valve drop at 10 BTDC and 10 ATDC and add the compressed gasket thickness? I don’t have any compressed gaskets and I don’t want to booger those cometics at $90 a pop.