1966/'69 A100 Twins Build

I gave up on blasting at home, unless it is small parts, local guy does it cheaper than I can buy the media for.

I use coal slag and Starblast. Both last a long time. So far I have about a bag and a half consumed. I doubt I will have more than $150 in materials when done. My time on the other hand…. My local place gets $100 per hour. I have about 12 hours in getting the interior of the cab done but there was a ton of black pits to get dig out. They take forever.