Need Quick Garage Cost Info ASAP !!

40x60 in upstate South Carolina just built 5 months ago, pole barn building cost 74k and it took them 3 months day one to finished. With site work, gravel, power, water, lights I am just north of 100k. Still need to pull 220 power to welders and finish work benches. Be careful how you chose I was going red iron and that is a better building, but I am up on a mountain and built behind my house. eve enclosement and anchor bolts on red iron cost extra, this ran the red iron building up to 135-150K and that depended on the truck driver being able to make 1 delivery attempt. beyond that it was extra. I did not like the open ended contract type deal. Red iron for me was 3 contractors the building, the concrete and the erector. The prices I was getting for 1 contractor to do it all was over 150k. The pole barn was one call, down payment, and they built it. I used Peake Construction, not sure if they build in Tn or not but my kit came from Tn. One big flat bed truck with the entire building on it! Either way it was not cheap but it is nice to have a big dry shop.