The Beaver Hole Hardwood Company Begins

What's the operational scheme?

I assume logs are the primary cargo.
Will you be manipulating "live" loads (IE moving scale logs on and off of the cars).

I see it is "point to point", a much talked about design goal in the MRR press.
However, have you considered a lift out, fold down, or otherwise removable section to enable continuous running?
I am a fairly hard core operations guy, but sometimes I find (particularly If I'm working on something in the room but not operating), that I just want to watch a train run by occasionally which is MUCH easier to accomplish if you don't have to keep stopping and reversing it.

I sure am glad 95% of the stuff I need to finish my setup has already been acquired (although I'm considering a temporary change from 1948 Ohio branch of PRR to 1995 FL industrial park regional Pinsley). PRICES are crazy right now. One new HO scale car is averaging $50!