A little more minor progress on the house fire situation
Well need to tidy up and a few more hangers, but depending on "sir inspector" the rough in plumbing is done. The kitchen is stubbed only to underneath the floor, as I want to toss the sink base in when the time comes, and drill up through the existing holes in the floor, up through the sink base floor.
Finished the hot stubbed to the vanity, and connected hot to the laundry. When I get time, I'll haul the washer BACK upstairs and will be able (legally or not) use it in it's proper place until insulation/ dry wall starts, just move it out of the way.
I still need to add the rear outdoor faucet, but that is not a priority. I actually could just connect a hose to the laundry and run that out
Bought two more of those junk glued sawdust shelves from Goodwill for 15 apiece. I guess a foot deep, 2ft? wide and 6ft high
I am tired, my back hurts.