Where have I been lately?
Huzzah! After six weeks of labor - much of it mine - this project is down to a tiny punch list. The exterior roll-up door won't be here for another week or so, and we're not going to knock out the wall separating the shop from the workroom till the outside door is there to secure the place. Otherwise this is done. The carport is 20x40 and will easily house four cars. The workroom is 12x30 and fully insulated with OSB walls to avoid getting clunked into. I'm a happy camper for sure. Now I need to get some shelving installed for storage and figure out where I'm going to put everything. I have a week to get all the crap out of the way so we can knock out the back wall to make that connection between the shop and workroom. Soon enough I'll be moving stuff to the new room and sorting through things to organize parts and clear some space in my ****-show of a shop. This has been a LOT of work but it's going to be sooooooooooooo nice when I get moved in.
Carport:
Workroom: