Got the first two rows of ceiling panels mounted today. Tomorrow I’ll mount three 8’ lights up there, and then I’ll be up above the panels wiring and insulating. After that, back down on the floor: Move everything over, and lather, rinse, repeat 3 more times.
View attachment 1716457649
View attachment 1716457650
View attachment 1716457651
Getting there!