30-day countdown to 12's

My thought is if I do a countdown, it will help me find the moments needed to make some changes and get this to the track. Really, I'm using this thread as self-motivation, holding myself accountable.
I'm determined to get a pass before track closes, and I'm determined to make it a 12 second pass. My schedule for the next 30 days is full already, but I got to find a couple minutes to make a difference. Enough to go 12's, even a 12.99 LOL.
  • 1980 D150 Long bed
  • 200,000 mile 5.9 (never even pulled the oil pan) with Hughes valve springs and oregon regrind cam
  • 727 I got for free, never pulled the pan on that either. Hughes converter.
  • 8.75 with 4.30's. 29" slicks.
View attachment 1716461640
Nice truck!