Go to Electrical updates/upgrades List
I have thought about whether to retain a bulkhead connector or do a sealed feed through. I see the benefits of both and if I retain the bulkhead connector all the contacts/wires will be new and the high amp circuits will be removed and only "signal" wires that energize relays will be retained, that should remove most of the chance of fire but all points of connection are a potential point of failure too.