Super Stock/Pro Stock Springs Installation

Mike, don't know what happened, must of got lost in space. Anyway, what I did was to move the leafs inboard ~3" so they're repositioned directly under the frame rails. Draw an imaginary line from eyebolt to eyebolt, then position the shackle 90 degrees to that line. That is the point which your upper shackle bolt should be. I drilled through the frame rail and welded a piece of pipe through the rail with welded washers on each side for added strength. Slap some grease in the pipe and attatch your upper shackle bolt. Make certain you have some freedom of movement, but not too loose either. Since your's are in the stock position, if you plan on leaving them there, you're gonna have to fabricate a foward bracket; no biggie if you're handy with a welder.

How wide a tire are you going to run?