got a forsale project going

Yesturday,i made a stainless mount for the electric fuel pump,and canister filter,and bolted that to the right rear frame rail.Then i got busy fabbing up a angle iron frame for the fuel cell to mount under the trunk floor.I have it all bolted in for now.The angle iron frame will be welded together and sent out for powder coating later,and will be kept as a bolt in configuration when complete,so it can be removed later if needed.I also installed the lokar kickdown cable,and started removing the trans to install the new/used 3000 stall converter.After that,maybe i can get the h pipe with flowmasters installed friday,the stainless overflow bottle for the radiator,and ill rob the accessory brackets,pulleys,and alternator,cooling fan off my truck to finish the mechanicals for first fireup.Then it will be wiring time.Lots of stuff to wire up on this car,since ill be running electric fan,linelock,maybe electric waterpump later,and the electric fuel pump.